PSH lifting and shifting three-dimensional parking garage video - Southern Power Grid


Release Time:

2019-07-25

The Southern Power Grid PSH lift-shift three-dimensional car park is located in Guangzhou, Guangdong Province. It was built in 2017 and uses a lift-shift three-dimensional car park system.

On-site operation video demonstration of the Southern Power Grid PSH lifting and shifting three-dimensional parking garage

-

The Southern Power Grid three-dimensional parking garage project in Guangzhou is located in Guangzhou City, Guangdong Province. This building uses a PSH two-story lifting and shifting three-dimensional parking garage from Shandong Laigang Tada Parking Garage Co., Ltd., with a total of 207 mechanical parking spaces.
 

Features of this three-dimensional parking equipment:

 
This type of parking equipment has many combinations, strong adaptability to the site, low requirements for civil engineering, can be arbitrarily combined and arranged according to the terrain and space, quick access to vehicles, easy to use and maintain, and low cost. It can be built outdoors, in the basement, or above and below ground in a building.