Mingquanju-Shenzhen mechanical garage project case

Mingquanju-Shenzhen mechanical garage project case
Mingquanju-Shenzhen mechanical garage project case
Mingquanju-Shenzhen mechanical garage project case
Mingquanju-Shenzhen mechanical garage project case
Mingquanju-Shenzhen mechanical garage project case
+
  • Mingquanju-Shenzhen mechanical garage project case
  • Mingquanju-Shenzhen mechanical garage project case
  • Mingquanju-Shenzhen mechanical garage project case
  • Mingquanju-Shenzhen mechanical garage project case
  • Mingquanju-Shenzhen mechanical garage project case

I. Brief introduction to the project of Mingquanju-Shenzhen mechanical garage project

 

Project Name: Mingquanju mechanical garage project
       Project address: No. 2022 Qiaoxiang Road, Futian District, Shenzhen
       Equipment type: PSH pit puzzle parking mechanical garage (negative two positive two, four floors in total)
       Construction time: 2006

 

II. Schematic diagram of PSH Pit (negative two, positive two) four-level Puzzle Parking Mechanical Garage

 

 

III.  Operation principle of PSH Pit(negative two positive two) four-level puzzle parking mechanical garage

 

The puzzle parking mechanical garage is the most widely used stereo parking solution in the market, and it is also one of the mechanical garage types with the highest market share in China. PSH Pit 4-Level puzzle mechanical garage (negative two positive two) parking equipment adopts the mode of motor drive + chain lifting, which can build a 4-storey mechanical mechanical garage combining underground two floors and ground two floors. It is a mechanical garage combining underground and ground. The entrance and exit is on the ground floor, which is a kind of equipment with high space utilization rate.

 

 

IV. Features and application scope of PSH pit four-level(negative two positive two) puzzle parking mechanical garage

 

The mechanical garage of Mingquanju community in Shenzhen is one of the many Shenzhen mechanical garage projects built by Laigang Tada. The project adopts the combination of two floors of pit and two floors of ground. A total of four-storey of mechanical garage are built, which not only saves space, but also increases parking spaces. This type of mechanical parking equipment mainly adopts motor-driven steel rope or chain lifting, large span design, PLC automatic control, and has more than 20 safety devices. It can build up to 8-storey (negative three positive five), with high space utilization, energy conservation and environmental protection. It is suitable for small space areas such as residential areas and office buildings. This type of parking equipment can also be designed as three or six connected. The specific number of parking spaces in each group can be customized according to the site conditions.

Operation Box Picture Of Early Shenzhen Mechanical Garage Project

 

V. About Us

Founded in 2001, and with a registered capital of USD 30 million, Shandong Tada Auto Parking Co., Ltd. has a Swiss R & D center and is a set of R & D, design, manufacturing, and engineering installations that rely on the two major steel giants, Shan Steel Group and Shagang Group. And after-sales service and one of the specialized automated parking system manufacturers.

 

 